⚡ Commercial Estimating SLA: 24-Hour Drawing Intake & 5-7 Day TI GMP Turnaround | Direct Estimating Line: (301) 323-8076 | Beltsville MD · Houston TX · Miami FL
2026 Commercial Cost Benchmarks / Transparent Pricing

COMMERCIAL CONSTRUCTION COST GUIDES & PRICING INDEX

Transparent construction cost intelligence for commercial building owners, tenant brokers, and corporate facility directors across Texas, the Mid-Atlantic, and South Florida. Understand actual market unit costs with zero broker markups.

Division 01 / Buildouts

Commercial Tenant Improvement (TI) Ranges

Square footage cost benchmarks for commercial interior buildouts based on project scope, finish tier, and mechanical alterations.

  • Warm Shell Basic Finish: $35 – $65 / SF
  • Standard Corporate Office TI: $65 – $115 / SF
  • Executive Level 5 & Boardroom Fitout: $115 – $175 / SF
  • Medical & Clinical Specialized TI: $140 – $225+ / SF
Request Project Takeoff
Division 09670 / Flooring

Commercial Epoxy & Resinous Floor Pricing

Unit pricing for commercial floor prep, moisture barriers, and resinous coating systems based on square footage.

  • Basic Industrial Solid Color Epoxy: $4.50 – $7.00 / SF
  • Full Flake Decorative Broadcast System: $6.00 – $9.50 / SF
  • Heavy Quartz Commercial Broadcast: $8.50 – $12.50 / SF
  • Designer Metallic Showroom System: $10.00 – $16.00 / SF
  • Moisture Vapor Mitigation Primer: +$1.75 – $2.50 / SF
Request Project Takeoff
Division 09 / Trades

Self-Performed Specialty Trade Unit Costs

Direct trade unit rates for metal framing, drywall skim, acoustical ceilings, and laser cleaning.

  • Cold-Formed Metal Stud Framing: $4.50 – $9.50 / SF of wall
  • Level 5 Drywall Hang, Tape & Skim: $3.25 – $5.50 / SF
  • Suspended Acoustical Ceiling Grid & Tile: $4.00 – $7.50 / SF
  • Industrial Laser Surface Cleaning: $8.00 – $18.00 / SF
Request Project Takeoff
Tax Acceleration

IRC § 179 & Bonus Depreciation Write-Offs

Accelerate upfront tax deductions for qualifying commercial tenant alterations and specialty coatings placed in service by December 31, 2026.

  • Up to $1,220,000 maximum immediate deduction limit
  • Applies to commercial interior improvements and epoxy
  • Phase-out threshold begins at $3,050,000 equipment spend
  • Consult your tax advisor to capture substantial 2026 savings
Request Project Takeoff

Request a Fast Guaranteed Maximum Price Bid

Have project architectural drawings? Upload your plan set to our Blueprint Plan Room for an enforceable 24-hour drawing takeoff and guaranteed line-item budget.

Submit Drawings to Plan Room