⚡ Commercial Estimating SLA: 24-Hour Drawing Intake & 5-7 Day TI GMP Turnaround | Direct Estimating Line: (301) 323-8076 | Beltsville MD · Houston TX · Miami FL
Commercial Estimating SLA / 24-Hour Drawing Intake

FAST-TRACK COMMERCIAL ESTIMATING & 24-HR TAKEOFF SLA

Traditional broker general contractors take 3 to 4 weeks waiting on third-party subcontractor bids. Because Pro Builder Group self-performs framing, drywall, ceilings, paint, and epoxy flooring, our in-house estimators produce accurate, itemized GMP bids in days.

Enforceable SLA

24-Hour Drawing Intake Docket

Submit architectural drawings (PDF, DWG) via our Plan Room. Within 24 hours, our Chief Estimator confirms drawing receipt, clarifies CSI scope gaps, and issues a tracking docket.

  • Instant confirmation & docket issuance
  • Automated plan room download link
  • CSI division scope gap analysis
  • Direct phone consultation within 24 hours
Request Project Takeoff
Direct Trade Pricing

3 to 5 Day Specialty Trade Takeoffs

For standalone trade packages (metal framing, drywall, epoxy flooring, acoustical ceilings, or laser cleaning), receive itemized square-foot and unit-price bids in 3 to 5 business days.

  • Real-time labor rate calculations
  • Direct bulk material mill pricing
  • Detailed square-foot schedule of values
  • Zero third-party broker markups
Request Project Takeoff
Turnkey TI Bids

5 to 7 Day Comprehensive TI GMP

Complete commercial tenant improvement proposals, including MEP trade scoping, phasing schedule, and Guaranteed Maximum Price contract ready for execution.

  • Full Schedule of Values (SOV)
  • Comprehensive Gantt milestone schedule
  • Value engineering cost-saving options
  • Transparent line-item labor & materials
Request Project Takeoff

Eliminate Bidding Bottlenecks Now

Experience the direct contractor advantage. Drop your plan set into our Blueprint Plan Room today and receive guaranteed estimating turnaround.

Submit Drawings to Plan Room