⚡ Commercial Estimating SLA: 24-Hour Drawing Intake & 5-7 Day TI GMP Turnaround | Direct Estimating Line: (301) 323-8076 | Beltsville MD · Houston TX · Miami FL
Clinical Construction & Medical Fitouts

HEALTHCARE CLINICS & MEDICAL FACILITY FITOUTS

Delivering code-compliant clinical healthcare environments built to strict infection control risk assessment (ICRA) protocols. Proven field performance for regional providers including the Spring Branch Community Health Center clinic network.

Radiation & Diagnostic

Lead-Lined Drywall & Shielding Assemblies

Installation of sheet lead-lined gypsum panels, lead-lined door frames, and telescopic lead glass viewing windows meeting physicist certification for X-ray and imaging suites.

  • Lead sheet lamination (1/16" to 1/8")
  • Lead joint strips & lead screw caps
  • Physicist shielding verification support
  • Direct inspection and county signoffs
Request Project Takeoff
Infection Control & Hygiene

Anti-Microbial & Scrubbable Wall Systems

Medical-grade wall protection, hygienic FRP paneling, impact-resistant corner guards, and seamless resinous epoxy coved base floors engineered for rigorous sanitation.

  • Seamless integral coved resinous bases
  • Anti-microbial silver-ion surface coatings
  • Chemical-resistant scrubbable paint finishes
  • High-impact wall cladding in transit corridors
Request Project Takeoff
Clean Air & Containment

ICRA Class IV Air Containment

Executing clinic expansions in occupied medical buildings using rigid modular containment barriers, HEPA negative air machines, and continuous differential pressure monitoring.

  • HEPA negative air filtration
  • Ante-room decontamination vestibules
  • Real-time manometer pressure logging
  • Zero particulate migration into patient areas
Request Project Takeoff

Clinical Case Proof: Spring Branch Health Center

Pro Builder Group successfully completed clinical interior modernizations for Spring Branch Community Health Center in Houston, delivering lead-shielded exam rooms, acoustic triage partitions, and durable hygienic finishes on a 3-week accelerated timeline.

Submit Drawings to Plan Room